top of page
Collaborated on a major £30M+ state-of-the-art, inter-disciplinary university science facility. The complex hub integrates multiple technical faculties, including Environmental Sciences, Computing, Engineering, and advanced laboratory spaces.

Higher Education STEM & Sciences Facility

Our Scope & Deliverables:

  • BIM Management & Coordination: Oversaw technical BIM workflows and cross-discipline coordination to ensure clash-free integration within a highly complex educational environment.

  • Detailed AV Modeling: Modeled comprehensive Audiovisual (AV) equipment layouts, ensuring accurate spatial allocations for lecture theatres, labs, and collaborative spaces.

  • Containment & Infrastructure: Detailed and routed critical containment paths, including dedicated conduits, power, and data socket placements required for advanced AV integration.

  • Setting Out & Documentation: Generated precise setting out sheets and technical installation drawings to streamline the on-site construction and positioning workflows.


Project Gallery

bottom of page