top of page
We transform engineering schematics into fully coordinated, installation-ready 3D models (LOD 400). By managing complex spatial data across HVAC, hydronic piping, and fire protection systems, we eliminate on-site routing conflicts before construction begins.

Our systematic clash detection and technical auditing bridge the gap between design intent and physical installation, ensuring maximum constructability and seamless execution for large-scale commercial and industrial facilities.

Class-A Commercial & Logistics Facility

  • Project Type: Class-A Commercial & Logistics Facility

  • Scope of Work: Full MEP 3D Modeling, Spatial Coordination, and Technical Audit (LOD 400).

  • Description: Reveal BIM Studio was appointed to deliver the comprehensive MEP modeling and coordination for a high-density commercial facility. Operating within a strict architectural envelope, our team transformed engineering schematic designs into fully coordinated, installation-ready 3D models, successfully bridging the gap between design intent and site installation.

Project Gallery

bottom of page